$143 007,00
Budget for the project actionReplacement of windows, repair of roof and cafeteria/festivity hall for General Education School in Hlinaia village (left bank)
Localities:
- Level: Local
- Region: Transnistrian region
- District: Slobozia
- Locality: Hlinaia
Contributing partners:
$143 007,00


Focus Areas:
- Capacity development
- Confidence building
- Education & sports
Target groups:
- Local authorities
- Population
Timeline:
Start date
End date
01 Nov 2015
01 Sep 2016
Results:
- Capital renovation of the unit where the sports and festivity halls, cafeteria are located. The roof of the building was replaced
- The façade and exterior finishing works were completed for the entire building. Inner yard of the school was paved
- All electrical and heating networks were replaced
- The sports hall was connected to hot water sources and shower facilities were installed. The kitchen of the cafeteria was renovated and old windows and doors were replaced for the entire edifice
Beneficiaries:
- 750 (250 pupils + 500 parents): 380 women