$156 360,00
Budget for the project actionRenovation of School nr. 2 in Chițcani village (left bank)
Localities:
- Level: Local
- Region: Transnistrian region
- District: Slobozia
- Locality: Chițcani
Contributing partners:
$156 360,00


Focus Areas:
- Capacity development
- Confidence building
- Education & sports
Target groups:
- Local authorities
- Population
Timeline:
Start date
End date
01 Nov 2015
01 Oct 2016
Results:
- Replacement of the roof for three units of the facility. The heating network was replaced in the main unit of the school
- General renovation of the block, which hosts the school cafeteria and full equipment of the lunchroom
- The entire roof has been equipped with rainwater collection and drainage systems to eliminate leakages and flooding in the school
Beneficiaries:
- 1,023 (420 pupils+550 parents+53 staff, 544 women and 479 men)