$156 360,00

Budget for the project action

Renovation of School nr. 2 in Chițcani village (left bank)

Localities:

  • Level: Local
  • Region: Transnistrian region
  • District: Slobozia
  • Locality: Chițcani

Contributing partners:

$156 360,00

SDG
SDG

Focus Areas:

  • Capacity development
  • Confidence building
  • Education & sports

Target groups:

  • Local authorities
  • Population

Timeline:

Start date End date
01 Nov 2015 01 Oct 2016

Results:

  • Replacement of the roof for three units of the facility. The heating network was replaced in the main unit of the school
  • General renovation of the block, which hosts the school cafeteria and full equipment of the lunchroom
  • The entire roof has been equipped with rainwater collection and drainage systems to eliminate leakages and flooding in the school

Beneficiaries:

  • 1,023 (420 pupils+550 parents+53 staff, 544 women and 479 men)
0